Location: Chillingham Newton Mill, Old Berwick, Alnwick, Northumberland
Project: Courtyard Tarmac Project.
We are Tarmac Contractors covering the Northumberland area. We do tarmac driveways, tarmac courtyards, tarmac roads and all associated excavation, leveling, drainage and finishing work.
This is a recent project we did for Mr Callum Sharp at Chillingham Newton Mill, Old Berwick. The project was carried over 2 days and involved: excavated the existing site to new levels; added drainage covers to new levels; K.1.50 bond coat applied to bond new surface; AC20mm base course laid to regulate surface; and finshed off with AC10mm Stone mastic asphalt. You can see more of Our Work here or if you”d like to talk to us about a project then Get in touch.